Open HARDWARE BAG 1.

INTRODUCTION IMPORTANT PRECAUTIONS

ASSEMBLY

BEFORE YOU BEGIN

P R E - A S S E M B LY

Disassemble box and remove the cardboard packaging that is not beneath the treadmill. Do not attempt to lift the treadmill at this time. Remove plastic wrap from console masts.

note: During each assembly step, ensure that ALL nuts and bolts are in place and partially threaded in before

completely tightening any ONE bolt. NOTE: A light application of grease may aid in the installation of hardware. Any grease, such as lithium bike grease is recommended.

A S S E M B LY STEP 1

HARDWARE BAG 1 CONTENTS :

BOLT (A)

FLAT WASHER (B)

65 mm

8 mm

Qty: 4

Qty: 4

LEAD WIRE

CONSOLE CABLE

 

TREADMILL OPERATION

CONDITIONING TROUBLESHOOTING GUIDELINES & MAINTENANCE

FLAT WASHER (B)

BOLT (A)

A

B Pull LEAD WIRE through RIGHT

CONSOLE MAST to drag upward.

C Place RIGHT CONSOLE MAST

into upright position using 2

BOLTS (A) and 2 WASHERS (B)

and tighten. Be sure to hold the console mast firmly, as it will not stay in the upright position on its own.

D Repeat on the left side. Note:

There is no wire in the LEFT

CONSOLE MAST.

LIMITED WARRANTY



Page 8
Image 8
Horizon Fitness CST3.6, CST4.6 quick start Console Mast to drag upward, Into upright position using