ASSEMBLY STEP 1

HARDWARE BAG 1 CONTENTS :

BOLT (A)

SPRING WASHER (B)

FLAT WASHER (C)

20 mm

15 mm

15 mm

Qty: 4

Qty: 4

Qty: 4

RUNNING DECK

LEFT

CONSOLE

MAST

FOOT LATCH

BASE FRAME

FLAT WASHERS (C)

SPRING WASHERS (B)

BOLTS (A)

ACut the yellow banding straps and lift the running deck upward until the foot latch locks. Remove all contents from underneath the running deck.

BOpen hardware bag 1.

CWith the running deck in the raised position, attach the left console mast to the base frame using 4 bolts (a), 4 spring washers (b) and 4 flat washers (c).

Note: Do not completely tighten any screws or bolts until step 4 is complete!

6

Page 6
Image 6
Horizon Fitness CT5.1 owner manual Assembly Step, Hardware BAG 1 Contents