ASSEMBLY STEP 2

HARDWARE BAG 2 CONTENTS :

BOLT (A)

SPRING WASHER (B)

FLAT WASHER (C)

20 mm

15 mm

15 mm

Qty: 4

Qty: 4

Qty: 4

LEAD WIRE

RUNNING DECK

CONSOLE CABLE

RIGHT CONSOLE MAST

BOLTS (A)

SPRING WASHERS (B)

FLAT WASHERS (C)

BASE FRAME

AOpen hardware bag 2.

BPull lead wire through right console mast. After pulling the lead wire through the mast, the top of the console cable should be located at the top of the mast. Detach and discard the lead wire.

CWith the running deck in the raised position, attach the right console mast to the base frame using 4 bolts

(a), 4 spring washers (b) and 4 flat washers (c).

Note: Do not completely tighten any screws or bolts until step 4 is complete!

Note: Be careful not to pinch any wires while assembling the right console mast.

7

Page 7
Image 7
Horizon Fitness CT5.1 owner manual Hardware BAG 2 Contents