15)Evacuate the system, and charge it with refrigerant. See the Charge Label in the machine compartment for the required refrigerant charge.

16)Connect the Terminals, and replace the Terminal Cover in its correct position.

17)Replace the panels in their correct positions.

18)Turn on the power supply.

4. REMOVAL AND REPLACEMENT OF DRIER

IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the Drier.

5)Install the new Drier, with the arrow on the Drier, in the direction of the refrigerant flow. Use nitrogen gas at the pressure of 3-4 PSIG when brazing the tubings.

6)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

7)Evacuate the system, and charge it with refrigerant. See the Charge Label in the machine compartment for the required refrigerant charge.

8)Replace the panels in their correct positions.

9)Turn on the power supply.

35

Page 35
Image 35
Hoshizaki KM-2400SRH3, KM-2400SRF3 service manual Removal and Replacement of Drier