[b]SANITIZING PROCEDURE - Following Cleaning Procedure

1)Dilute a 5.25% Sodium Hypochlorite solution (chlorine bleach) with water (Add

3.5fl. oz. of sanitizer to 7 gal. of water).

2)Remove the Insulation Panel, if it is in its normal position.

3)Pour the sanitizing solution into the Water Tank.

4)Replace the Insulation Panel and the Front Panel in their correct positions.

Note: Make sure that the Control Switch is in the “WASH” position and the Cleaning Valve is in the “Open” position.

5)Turn on the power supply, and start the sanitizing process.

6)Turn off the power supply after 15 minutes.

7)Remove the Front Panel and if necessary, the Insulation Panel.

8)Drain the Water Tank. Refer to step 5) in “[a] CLEANING PROCEDURE.”

9)Replace the removed parts and the Insulation Panel in their correct positions.

10)Repeat steps 16) through 28) in “[a] CLEANING PROCEDURE” two times to rinse thoroughly.

11)Close the Cleaning Valve.

12)Move the Control Switch to the “ICE” position.

13)Replace the Front Panel in its correct position.

14)Clean the Storage Bin with water.

15)Turn on the power supply, and start the automatic icemaking process.