![Manual background](/images/new-backgrounds/64402/6440243x1.webp)
Control Board (CB) Setting Menu
|
|
|
| |
Category | No. | Item | Range | Default |
Compressor | 37 | Compressor Output Selection | 0: X8 (DC Relay) On | 1 |
|
| DO NOT ADJUST | 1: X1 (AC Relay) On |
|
50 | Pump | 0 to 90 sec. | 0 | |
Control |
| When temperature at evaporator (cube control) | 0=ignore, no |
|
|
| thermistor drops to 37°F (3°C) in the freeze cycle, | (1 sec. increments) |
|
|
| pump |
|
|
|
|
|
|
|
| 51 | 0 to 5 sec. | 0 | |
|
| Time inlet water valve is energized while pump is | (1 sec. increments) |
|
|
|
|
| |
|
| 50) is greater than 0. |
|
|
|
|
|
|
|
Hard Water | 60 | Integrated Value | 10 to 100% | 10 |
Control |
| If hard water control water supply time (CB Setting | (00=100) |
|
|
| 61) is greater than 0: After evaporator (cube control) | (1% increments) |
|
|
| thermistor indicates temperature of 32°F (0°C) in |
|
|
|
| freeze cycle, inlet water valve energized starting |
|
|
|
| when percentage of freeze cycle termination |
|
|
|
| temperature and freeze cycle time integrated value |
|
|
|
| has been achieved. |
|
|
|
| DO NOT ADJUST |
|
|
| 61 | Hard Water Control Water Supply Time | 0 to 90 sec. | 0 |
|
| Time inlet water valve is energized after integrated | (1 sec. increments) |
|
|
| value (CB Setting 60) conditions are met. |
|
|
|
| Before using this setting, follow the instructions to |
|
|
|
| improve ice clarity; see "III.H.2. Ice Clarity." |
|
|
|
|
|
|
|
Water Tank | 70 | If control board thermistor temperature is above | See Ranges Below | See |
Ice Control | 71 | the water tank ice control lower temperature setting |
| Defaults |
| 72 | (CB Setting 74) and equal to or less than the |
| Below |
| 74 | water tank ice control upper temperature setting |
|
|
|
| (CB Setting 70) when freeze cycle termination |
|
|
|
| temperature (CB Setting 2) is met, the hot gas valve |
|
|
|
|
|
| |
|
| by the hot gas valve |
|
|
|
| (CB Settings 71 and 72) to reduce bonding of the |
|
|
|
| water tank to the evaporator. |
|
|
|
|
|
|
|
Water Tank | 70 | Water Tank Ice Control Upper Temperature | 10 to 60°C | 44 |
Ice Control |
| See CB Setting 70, 71, 72, 74 description above. | (1°C increments) |
|
& Ice Bridge |
| Ice Bridge Control Temperature |
|
|
Control |
| See CB Setting 73 description below. |
|
|
|
|
|
|
|
Water Tank | 71 | Water Tank Ice Control Hot Gas Valve Energized | 0 to 20 sec. | 5 |
Ice Control |
| Time | (1 sec. increments) |
|
|
| See CB Setting 70, 71, 72, 74 description above. |
|
|
|
|
|
|
|
| 72 | Water Tank Ice Control Hot Gas Valve | 10 to 60 sec. | 25 |
|
| Time | (1 sec. increments) |
|
|
| See CB Setting 70, 71, 72, 74 description above. |
|
|
|
|
|
|
|
Ice Bridge | 73 | Ice Bridge Control Hot Gas Valve | 0 to 30 sec. | 0 |
Control |
| Time hot gas valve is | (1 sec. increments) |
|
|
| harvest cycle if control board thermistor temperature |
|
|
|
| is above the ice bridge control temperature |
|
|
|
| (CB Setting 70) when freeze cycle termination |
|
|
|
| temperature (CB Setting 2) is met. |
|
|
|
|
|
|
|
22