HP 480 manual Phase 4 Initialize and Verify the Router, This phase involves these steps

Models: 480

1 144
Download 144 pages 46.37 Kb
Page 35
Image 35
This phase involves these steps:

Installation

Phase 4: Initialize and Verify the Router

This phase involves these steps:

A. Creating or modifying a configuration (page 1-28)

B. Booting the router (page 1-30)

C. Setting the correct time and date (page 1-33)

D. Setting Manager and User passwords (page 1-34)

E. Verifying router initialization (page 1-36)

When you power on the router as described in step 4 of the preceding subsection (page 1-22), you will see the Main menu.

NCL

Configuration Editor

Quick Configuration Utility

Pointer

Figure 1-24. The Main Menu

Installation 1

1-27

Page 35
Image 35
HP 480 manual Phase 4 Initialize and Verify the Router, This phase involves these steps, 24. The Main Menu