Contents

 

Overview

5

About this document

5

Safety and IEC compliance

5

Site assessment

6

Site preparation

6

Site safety and security

6

Fire detection and suppression

6

HP POD 20c capacities

7

HP POD 20c capacity limitations

7

Electrical power capacities (critical IT power)

7

Mechanical cooling capacities

7

Overall system capacities

7

Site requirements

8

Site pad

8

HP POD 20c weight

8

Dimensions and clearances

8

Future expansions

10

Grounding requirements

11

Utilities

12

Humidifier water supply

12

Drainage

13

Chilled water supply

13

Piping materials

14

Power infrastructure installation

14

Site electrical system

15

Electrical power system configuration

15

Supported facility connections

16

Environmental control system

16

Additional POD connections

16

Connection portals

16

Humidifier

17

HP POD 20c access control

18

Fire, safety, and access notifications

18

Fire box

18

Demarcation box

19

Environmental considerations

21

Environmental risks

21

Cold weather

21

Areas prone to lightning or power surges

21

Seismic activity

21

Site plan requirements and actions

22

Completing a site assessment

22

HP Site Preparation Drawing Package

22

Contents

3

Page 3
Image 3
HP Performance Optimized Data Center (POD) 20cp manual Contents