Index

A

about this guide 5

areas prone to lightning or power surges 21 assembly 29

assembly area 23

C

capacity limitations 7 clearance area 8

cold weather considerations 21 communication connections 18, 19 connection portals 16 connections, additional 16 connections, facility 16

D

delivery considerations 29 dimensions 8

drainage 13

E

electrical power capacity 7 electrical system 15 environmental considerations 21 environmental control system (ECS) 16 environmental risks 21

equipment, installation 23

F

facility connections 16 fire and safety 18 fire suppression 6 future expansions 10

G

grounding requirements 11

H

HP site preparation drawing package 22

humidifier 12, 17

I

installation 23 installation equipment 23

L

lifting layout and requirements 23 lightning protection 21

M

materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 33

O

other objects 25 overview 5

P

permit requirements 22 piping materials 14

power infrastructure installation 14 power surges 21

pre-delivery 29

preparing for assembly 29 project coordination 22

R

regulatory compliance identification numbers 33 regulatory compliance notices 33

regulatory compliance, HP POD 20c 5, 32

S

safety information 6, 33

security 6, 18

 

seismic activity

21

site assessment

6, 22, 26

site assessment checklist 26 site pad 8

Index 37

Page 37
Image 37
HP Performance Optimized Data Center (POD) 20cp manual Index, Site assessment checklist 26 site pad