Index
A
about this guide 5
areas prone to lightning or power surges 21 assembly 29
assembly area 23
C
capacity limitations 7 clearance area 8
cold weather considerations 21 communication connections 18, 19 connection portals 16 connections, additional 16 connections, facility 16
D
delivery considerations 29 dimensions 8
drainage 13
E
electrical power capacity 7 electrical system 15 environmental considerations 21 environmental control system (ECS) 16 environmental risks 21
equipment, installation 23
F
facility connections 16 fire and safety 18 fire suppression 6 future expansions 10
G
grounding requirements 11
H
HP site preparation drawing package 22
humidifier 12, 17
I
installation 23 installation equipment 23
L
lifting layout and requirements 23 lightning protection 21
M
materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 33
O
other objects 25 overview 5
P
permit requirements 22 piping materials 14
power infrastructure installation 14 power surges 21
preparing for assembly 29 project coordination 22
R
regulatory compliance identification numbers 33 regulatory compliance notices 33
regulatory compliance, HP POD 20c 5, 32
S
safety information 6, 33
security 6, 18 |
|
seismic activity | 21 |
site assessment | 6, 22, 26 |
site assessment checklist 26 site pad 8
Index 37