MA7200 PLUS Inverter 1 to 2 HP PID Fan and Pump Quick Start Manual

__________________________________________________________________

Step 13 – Testing The System

The system can now be tested for performance. To do this, set the set-pointthrough the keypad and run the drive at some low level and check that the motor is operating properly and that the feedback signal level and polarity are correct.

Check the system for dynamic operation and make any adjustments necessary for optimum performance. This may require making adjustments to parameters Bn-17 proportional gain and Bn-18 Integral Time. (Refer to Step 10)

NOTE: Parameters Bn-17 and Bn-18 may be changed through the keypad while the system is operating.

A word of CAUTION ! - the parameter changes should be made in small increments and the results checked to avoid highly unstable and possibly damaging conditions.

This should complete the installation.

MA7200 PLUS BLOCK DIAGRAM

Fig. 5 is an overall basic electrical connection diagram for the MA7200 PLUS. It is used in conjunction with the other sections of this guide to give the user the ability to successfully start up a fan or pump application. More detailed information is available in the MA7200 PLUS Manual to which the user is referred, if further information is required.

________________________________________________________________ 21

TECO – Westinghouse Motor Company