New Construction – attaching to joist
A11 |
E |
5/8 |
1/2 |
Position the correct depth mark at the bottom edge of the joist
based on the thickness of your sheetrock.
A13 |
Pull wires through the strain relief.
A12 |
Screw
A14 |
|
| Ground |
|
| 2 Pin | Black | Green |
|
|
| A | Bare Copper | |
|
| White | ||
|
|
| ||
Fan Motor |
|
| Black Main Switch 1 (AC In) | |
F |
| White |
| White |
Light | 3 Pin | Black Light |
|
|
|
|
| ||
|
| *Option |
|
|
*Option Fan & Main Light Together | Black | Switch 2 (AC In) | ||
|
|
Connect wires as shown.
6