6.Remove the GbE switch module from its static-protective package.

4.Remove the filler module from the selected bay. Store the filler module for future use.

5.If you have not already done so, touch the static-protective package that contains the GbE switch module to any unpainted metal surface of the BladeCenter unit or any unpainted metal surface on any other grounded rack-component for at least 2 seconds.

6.Remove the GbE switch module from its static-protective package.

7.Make sure that the release latch on the GbE switch module is in the open position (perpendicular to the module).

8.Slide the GbE switch module into the applicable I/O-module bay until it stops.

RS232

LINK

1 TX/RX LINK

2 TX/RX LINK

3 TX/RX LINK

4 TX/RX

I/O module

Release latch

9.Push the release latch on the front of the GbE switch module to the closed position. After you insert and lock the GbE switch module, it is turned on, and the power-on self-test (POST) runs to verify that the GbE switch module is operating correctly. The POST results are displayed by the status LEDs.

10.Make sure that the LEDs on the GbE switch module indicate that it is operating correctly. Make sure that the OK LED on each GbE switch module is lit. See “LEDs” on page 6 for a description of the operation of these LEDs.

11.If you have other GbE switch modules to install, do so now; otherwise, go to step 12.

Chapter 2. Installing and removing the GbE switch module 11

Page 21
Image 21
IBM Nortel 10 manual Remove the GbE switch module from its static-protective package