Installation Guide
Nortel 10 Gigabit Uplink Ethernet Switch
Module for IBM BladeCenter
Page
 Installation Guide
 First Edition May
 Contents
Safety
Chapter 2. Installing and removing the GbE switch module
Chapter 3. Installing and removing options
 Chapter 7. Parts listing
Chapter 8. Solving problems
Appendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004
Chapter 6. Updating the software
 Safety
 vi Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
Antes de instalar este produto, leia as Informações sobre Segurança
 Statement DANGER
To avoid a shock hazard
Page
 Chapter 1. Introduction
Media access control MAC address label
Product name and serial number label
 Specifications
Media access control MAC address
v Safety Information
Related documentation
 v IBM BladeCenter Management Module Command Line Reference Guide
Notices and statements used in this document
 Major components of the GbE switch module
Information panel RS232 serial console port CX4 ports Release latch
4 TX/RX XFP port
SFP port
 Information panel overview
RS232 serial port
CX 4 port
XFP module
 LEDs
TX/RX
 Chapter 1. Introducing the Gigabit Ethernet switch module
 8 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Chapter 2. Installing and removing the GbE switch module
Installation guidelines
 Installing the GbE switch module
System reliability considerations
Handling static-sensitive devices
 6. Remove the GbE switch module from its static-protective package
 Removing the GbE switch module
12 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Chapter 2. Installing and removing the GbE switch module
 14 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Chapter 3. Installing and removing options
Handling an XFP or SFP module
Statement
 Installing an XFP module
DANGER
Class 1 Laser Product Laser Klasse Laser Klass Luokan 1 Laserlaite `
Appareil A Laser de Classe
 Chapter 3. Installing and removing options
LINK
TX/RX
 Installing an SFP module
Removing an XFP module
Wire tab Protective cap XFP module
 Removing an SFP module
SFP module
 20 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Connecting the serial console cable
Disconnecting the serial console cable
Connecting the CX4 module cable
Chapter 4. Cabling
 Disconnecting a CX4 module cable
Connecting an XFP module cable
 1. Remove the protective caps from the end of the fiber-optic cable
 Disconnecting the XFP module cable
Connecting the SFP module cable
Disconnecting an SFP module cable
 Chapter 5. Configuring the GbE switch module
 26 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Establishing a TCP/IP session using the management module
2. From the I/O Module Tasks menu, click Configuration
 Configuring the GbE switch module using Telnet
Enabling management over external ports
External management
External ports
 Connecting to the GbE switch module
Accessing the main menu
Configuring the GbE switch module using the serial-port interface
 v 9600 baud v 8 data bits v No parity v 1 stop bit v No flow control
 Initial configuration
 Logging in to the GbE switch module
 Determining the level of GbE switch module software
Obtaining the latest level of switch software
Chapter 6. Updating the software
3. Locate the I/O Module Firmware VPD section
 Upgrading the GbE switch module software
 Resetting and restarting the GbE switch module
3. Click Power Off Modules
 36 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Chapter 7. Parts listing
 38 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Chapter 8. Solving problems
POST errors
Running POST
 Diagnostic indicator in
40 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
Failing functional area
Failure criticality
 Using the documentation
Chapter 9. Getting help and technical assistance
Before you call
 Software service and support
Hardware service and support
Getting help and information from the World Wide Web
42 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Appendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004
What this Warranty Covers
What this Warranty Does not Cover
Part 1 - General Terms
 How to Obtain Warranty Service
What IBM Will Do to Correct Problems
 Exchange of a Machine or Part
Your Additional Responsibilities
 Limitation of Liability
Governing Law
 Part 2 - Country-unique Terms
Jurisdiction
AMERICAS ARGENTINA
Jurisdiction The following is added after the first sentence
 COLOMBIA
EQUADOR
MEXICO
PARAGUAY
 NORTH AMERICA
CANADA
Limitation of Liability The following replaces item 1 of this section
UNITED STATES
 CAMBODIA AND LAOS
CAMBODIA, INDONESIA, AND LAOS
Arbitration The following is added under this heading
HONG KONG S.A.R. OF CHINA AND MACAU S.A.R. OF CHINA
 JAPAN
Governing Law The following sentence is added to this section
MALAYSIA
 NEW ZEALAND
PEOPLE’S REPUBLIC OF CHINA PRC
PHILIPPINES
 SINGAPORE
EUROPE, MIDDLE EAST, AFRICA EMEA
THE FOLLOWING TERMS APPLY TO ALL EMEA COUNTRIES
 1 “the laws of Austria” in Albania, Armenia, Azerbaijan, Belarus
Jurisdiction The following exceptions are added to this section
54 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Cameroon, Cape Verde, Central African Republic, Chad, Comoros, Congo Republic, Djibouti, Democratic Republic of Congo, Equatorial Guinea, French Guiana, French Polynesia, Gabon, Gambia, Guinea, Guinea-Bissau, Ivory Coast, Lebanon, Madagascar, Mali, Mauritania, Mauritius, Mayotte, Morocco, New Caledonia, Niger, Reunion, Senegal, Seychelles, Togo, Tunisia, Vanuatu, and Wallis & Futuna all disputes arising out of this Statement of Limited Warranty or related to its violation or execution, including summary proceedings, will be settled exclusively by the Commercial Court of Paris 5 in Russia, all disputes arising out of or in relation to the interpretation, the violation, the termination, the nullity of the execution of this Statement of Limited Warranty shall be settled by Arbitration Court of Moscow 6 in South Africa, Namibia, Lesotho and Swaziland, both of us agree to submit all disputes relating to this Statement of Limited Warranty to the jurisdiction of the High Court in Johannesburg 7 in Turkey all disputes arising out of or in connection with this Statement of Limited Warranty shall be resolved by the Istanbul Central Sultanahmet Courts and Execution Directorates of Istanbul, the Republic of Turkey 8 in each of the following specified countries, any legal claim arising out of this Statement of Limited Warranty will be brought before, and settled exclusively by, the competent court of a Athens for Greece
 How to Obtain Warranty Service The following is added to this section
EUROPEAN UNION EU
THE FOLLOWING TERMS APPLY TO ALL EU COUNTRIES
CONSUMERS
 FRANCE AND BELGIUM
THE FOLLOWING TERMS APPLY TO THE COUNTRY SPECIFIED AUSTRIA
 The following paragraphs are added to this section
The second paragraph does not apply
The following sentence is added to the end of item
EGYPT
 GERMANY
HUNGARY
 What this Warranty Covers The following is added to this section
IRELAND
Items for Which IBM is Not Liable
 SLOVAKIA
SOUTH AFRICA, NAMIBIA, BOTSWANA, LESOTHO AND SWAZILAND
UNITED KINGDOM
 Part 3 - Warranty Information
Warranty Period
Nortel 10 Gigabit Uplink Ethernet Switch Module for IBM BladeCenter
Types of Warranty Service
 1. Customer Replaceable Unit “CRU” Service
2. On-site Service
3. Courier or Depot Service
4. Customer Carry-In or Mail-In Service
 7. CRU and Customer Carry-In or Mail-In Service
EU Country Telephone List
 Appendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004
Italy -- +39-800-820-094
 66 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Appendix B. Notices
IBM Director of Licensing IBM Corporation North Castle Drive
Armonk, NY U.S.A
 Trademarks
 Important notes
Product recycling and disposal
Appendix B. Notices
 70 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Battery return program
Electronic emission notices
Federal Communications Commission FCC statement
 United Kingdom telecommunications safety requirement
Industry Canada Class A emission compliance statement
Australia and New Zealand Class A statement
European Union EMC Directive conformance statement
 Taiwanese Class A warning statement Chinese Class A warning statement
Japanese Voluntary Control Council for Interference VCCI statement
 74 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Index A
 76 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
 Index
 78 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide
Page
 1P P/N 31R1719