IBM Nortel 10 manual Resetting and restarting the GbE switch module, Click Power Off Modules

Models: Nortel 10

1 90
Download 90 pages 15.35 Kb
Page 45
Image 45
Resetting and restarting the GbE switch module

/boot/gtimg imageX TADDR zzzzz

Where imagex is the image to install and zzzzz is the operating-system image file name.

3.Reset and restart the GbE switch module as described in “Resetting and restarting the GbE switch module.”

4.At the CLI prompt, type the following command and press Enter.

/boot/gtimg boot TADDR yyyy

Where yyyy is the boot image file name.

5.Repeat step3.

Resetting and restarting the GbE switch module

To activate the new image or images, you must reset the GbE switch module. To reset the GbE switch module, complete the following steps:

1.From the I/O Module Tasks menu, click Admin/Power/Restart. The management module window opens.

2.Select the I/O module bay on which the software update was just installed.

3.Click Power Off Module(s).

4.Select the I/O module bay on which the software update was just installed.

5.Click Power On Module(s). Wait 60 seconds for POST to be completed.

6.Click Monitors, and select Firmware VPD. The Firmware VPD window opens.

7.In the Firmware VPD window, locate the I/O Module Firmware VPD section. Page down to the number of the I/O module bay that contains the GbE switch module that you just installed; then, note the corresponding level of the software for the GbE switch module. Confirm that the software build ID and revision reflect the correct software release.

Chapter 6. Updating the software

35

Page 45
Image 45
IBM Nortel 10 manual Resetting and restarting the GbE switch module, Click Power Off Modules