z/OS Capacity provisioning allows you to set up rules

defi ning the circumstances under which additional capac- ity should be provisioned in order to fulfi ll a specifi c busi- ness need. The rules are based on criteria, such as: a specifi c application, the maximum additional capacity that should be activated, time and workload conditions. This support provides a fast response to capacity changes and ensures suffi cient processing power will be available with the least possible delay even if workloads fl uctuate.

An installed On/Off CoD record is a necessary prerequisite for automated control of temporary capacity through z/OS Capacity Provisioning.

See z/OS MVS Capacity Provisioning User’s Guide (SA33- 8299) for more information.

On/Off CoD Test: On/Off CoD allows for a no-charge test. No IBM charges are assessed for the test, including IBM charges associated with temporary hardware capacity, IBM software, or IBM maintenance. This test can be used to validate the processes to download, stage, install, acti- vate, and deactivate On/Off CoD capacity non-disruptively. Each On/Off CoD-enabled server is entitled to only one no- charge test. This test may last up to a maximum duration of 24 hours commencing upon the activation of any capac- ity resources contained in the On/Off CoD record. Activa- tion levels of capacity may change during the 24 hour test period. The On/Off CoD test automatically terminates at the end of the 24 hours period. In addition to validating the On/Off CoD function within your environment, you may choose to use this test as a training session for your per- sonnel who are authorized to activate On/Off CoD.

SNMP API (Simple Network Management Protocol Appli- cation Programming Interface) enhancements have also been made for the new Capacity On Demand features.

More information can be found in the System z10 Capacity On Demand User’s Guide, SC28-6871.

Capacity on Demand – Permanent Capacity

Customer Initiated Upgrade (CIU) facility: When your business needs additional capacity quickly, Customer Initiated Upgrade (CIU) is designed to deliver it. CIU is designed to allow you to respond to sudden increased capacity requirements by requesting a System z10 BC PU and/or memory upgrade via the Web, using IBM Resource Link, and downloading and applying it to your System z10 BC server using your system’s Remote Support connec- tion. Further, with the Express option on CIU, an upgrade may be made available for installation as fast as within a few hours after order submission.

Permanent upgrades: Orders (MESs) of all PU types and memory for System z10 BC servers that can be delivered by Licensed Internal Code, Control Code (LIC-CC) are eligible for CIU delivery. CIU upgrades may be performed up to the maximum available processor and memory resources on the installed server, as confi gured. While capacity upgrades to the server itself are concurrent, your software may not be able to take advantage of the increased capacity without performing an Initial Programming Load (IPL).

 

System z9

 

System z10

 

 

 

 

 

 

Resources

CP, zIIP, zAAP, IFL, ICF

 

CP, zIIP, zAAP, IFL, ICF, SAP

Offerings

Requires access to IBM/

 

No password required or

 

RETAIN® to activate

 

access to IBM/RETAIN to

 

 

 

activate

 

CBU, On/Off CoD

 

CBU, On/Off CoD, CPE

 

One offering at a time

 

Multiple offerings active

Permanent

Requires de-provisioning

 

Concurrent with temporary

upgrades

of temporary capacity first

 

offerings

Replenishment

No

 

Yes w/ CBU & On/Off CoD

CBU Tests

5 tests per record

 

Up to 15 per record

CBU Expiration

No expiration

 

Specific term length

Capacity

 

 

 

Provisioning

No

 

Yes

Manager Support

 

 

 

44

Page 44
Image 44
IBM Z10 BC manual OS Capacity provisioning allows you to set up rules, System z9 System z10