Johnson Controls LM8M/LMLM*MP Furnace Assembly - Pc Series Coils, Critical Coil Projection

Models: LM8M/LMLM*MP TM8M/TMLM*MP CM8M/CMLM*MP YM8M/YMLM*MP

1 28
Download 28 pages 19.77 Kb
Page 6
Image 6
FURNACE ASSEMBLY - PC SERIES COILS

368261-UIM-A-0508

For horizontal left hand applications no conversion is required to an MC coil when used with a downflow/horizontal furnace. A mounting plate, supplied with every coil should always be installed on the side desig- nated as top side. See Figures 4 & 5.

Mounting PlateCOIL SIZE

Furnace

FIGURE 5: Horizontal Left Application

FURNACE ASSEMBLY - PC SERIES COILS

These upflow coils are designed for installation on top of upflow fur- naces only.

If the coil is used with a furnace of a different size, use a 45° transition to allow proper air distribution through the coil.

1.Position the coil casing over the furnace opening as shown in Fig- ure 6, "PC Series Upflow Coil Installation".

2.Place the ductwork over the coil casing flange and secure.

3.Check for air leakage between the furnace and coil casing and seal appropriately.

Do not drill any holes or drive any screws into the front duct flange on the coil in order to prevent damaging coil tubing. See Figure 6, "PC Series Upflow Coil Installation"

C

D(Min)

 

 

Flexible

 

 

Duct Collar

Field

 

 

Fabricated

 

 

Ductwork

 

Do not drill

 

 

or Screw

Upflow

 

this flange

Coil

 

 

Upflow

 

 

Furnace

 

 

Primary

Secondary

Alternate

Drain

Drain Location

Drain

 

 

FIGURE 6: PC Series Upflow Coil Installation

Table 2: Coil Projection Dimensions - PC Series Coils

COIL SIZE

DIMENSION “C” INCH

PC18

3-1/2

PC24

4-1/2

PC30, PC32, PC35

4-1/2

PC42, PC43, PC36, PC37

5-1/2

PC48

6-1/2

PC60

9

NOTE: Dimension “C” should be at least 2/3 of dimension “D”. See Fig- ure 6, "PC Series Upflow Coil Installation"

CRITICAL COIL PROJECTION

The coil assembly must be located in the duct such that a minimum dis- tance is maintained between the top of the coil and the top of the duct. Refer to Table 2, "Coil Projection Dimensions - PC Series Coils".

COIL / FURNACE ASSEMBLY - HC SERIES COILS

These coils are supplied ready to be installed in a right hand position or a left hand position. When used in conjunction with a horizontal furnace (blow through) application, the coil should be oriented with the opening of the “A” coil closest to the furnace. See Figures 7.

NOTE: Each coil is shipped with an external tie plate that should be used to secure the coil to the furnace. It should be installed on the back side of the coil using the dimpled pilot holes. See Figures 7.

Use tie plate

supplied with coil

Gas Furnace

FIGURE 7: Horizontal Left or Right application (Right Shown)

DOWNFLOW DUCT CONNECTORS

All downflow installations must use a suitable duct connector approved by the furnace manufacturer for use with this furnace. The duct connec- tors are designed to be connected to the rectangular duct under the floor and sealed. Refer to the instructions supplied with the duct con- nector for proper installation. Refer to the separate accessory parts list at the end of these instructions for the approved accessory duct con- nectors.

FURNACE

WARM AIR PLENUM

WITH 1” FLANGES

FIBERGLASS

INSULATION

FIBERGLASS TAPE

UNDER FLANGE

COMBUSTIBLE FLOOR

BASE ACCESSORY

FIGURE 8: Combustible Floor Base Accessory

RESIDENTIAL AND MODULAR HOME UPFLOW RETURN PLENUM CONNECTION

Return air may enter the furnace through the side(s) or bottom depend- ing on the type of application. Return air may not be connected into the rear panel of the unit.

6

Johnson Controls Unitary Products

Page 6
Image 6
Johnson Controls LM8M/LMLM*MP Furnace Assembly - Pc Series Coils, Critical Coil Projection, Downflow Duct Connectors