3.6To assist in marking the positions of the fixing holes, reverse the shower valve and fit the building in shroud through the cutout in the front of the panel. Mark the positions of the M5 fixing holes in the two top brackets only.

Important! Make sure that the correct holes are used (refer to illustration).

Warning! Do not drill any holes for the bottom securing bracket.

3.7Drill the two 5 mm holes for the fixings (countersink the holes at the front).

3.8Remove the building-in shroud (retain the screws for later use).

3.9Secure the shower valve (positioned from the rear of the panel) with the M5 x 40 mm fixing screws (refer to illustration).

3.10Fit the hot and cold supply pipes and tighten the compression nuts. Caution! Make sure that the olives are fitted and all pipework is flushed through before connecting to the shower control.

3.11Fit the outlet pipework, leaving enough pipe through the wall to temporarily cap off.

3.12Turn on the water supplies and check for leaks.

3.13Fit the shower fittings, refer to your fittings installation and user guide for instructions.

3.14Fit the concealing plate and control assembly, refer to section: ‘Control Assembly’.

M5 Fixing

Holes

Securing Screws

Warning! Do not drill or screw here.

18

Page 18
Image 18
Kohler Discovery manual M5 Fixing Holes Securing Screws