Manuals
/
Kohler
/
Household Appliance
/
Plumbing Product
Kohler
Discovery manual D D C D, G E C, K, J K, J A, L I J
Models:
Discovery
1
27
28
28
Download
28 pages
11.08 Kb
21
22
23
24
25
26
27
28
<
>
Specification
Install
Dimension
Maintenance
Symptom
Control Assembly
Maximum Temperature Setting
Key to symbols
Safety
Customer Service
Page 27
Image 27
D
D
C
D
B
G
E
C, K, J
K, J
A
L
I
J
27
Page 26
Page 28
Page 27
Image 27
Page 26
Page 28
Contents
These instructions are to be left with the user
Installation and User Guide
BUILT IN DUAL CONTROL SHOWER VALVE
CONTENTS
INTRODUCTION
SAFETY WARNINGS
PACK CONTENTS
Note! All Dimensions are Nominal
DIMENSIONS
Flow Rates
SPECIFICATIONS
Pressures
Temperatures
Thermostatic Shut-down
Connections
Gas heated system
INSTALLATION REQUIREMENTS
Key to symbols
Gravity fed system
The shower can be installed with a
Mains pressurised instantaneous
hot water system thermal store
Pumped system
General
INSTALLATION
Installation Methods
1. Solid Wall or Stud Partition
Using Securing Brackets - Mounting off Front Face
1.9Drill three 6 mm holes for the wall plugs
Minimum Building-inDepth Maximum Building-inDepth
Spirit Level Building-in Shroud Securing Screws
2. Solid Wall or Stud Partition
Using Rear Fixing Points on Shower Control
Page
3. Laminated Panel
Using Securing Brackets - Mounting off Rear Face
M5 Fixing Holes Securing Screws
Warning! Do not drill or screw here
Control Assembly
‘Commissioning’
Push up and Latch over the Top of the Backplate
Align Flow Lever as Shown ‘Click’ into Position
Reversed Supplies
COMMISSIONING
Maximum Temperature Setting
Temperature Knob
OPERATION
Flow Control Lever OFF ON
COLD
and ‘Commissioning’
FAULT DIAGNOSIS
SYMPTOM
CAUSE/RECTIFICATION
Filters
MAINTENANCE
Cleaning
Lubricants
SPARE PARTS
D D C D
G E C, K, J K, J A
L I J
Kohler Mira Limited, February
CUSTOMER SERVICE
1058366-W2-A
1609