Manuals
/
Kohler
/
Household Appliance
/
Plumbing Product
Kohler
Discovery manual Customer Service, 1058366-W2-A, 1609, Kohler Mira Limited, February, 7-#5
Models:
Discovery
1
28
28
Download
28 pages
11.08 Kb
21
22
23
24
25
26
27
28
<
>
Specs
Install
Dimension
Maintenance
Symptom
Control Assembly
Maximum Temperature Setting
Temperature Knob
Key to symbols
Safety
Page 28
Image 28
CUSTOMER SERVICE
7-#5
1058366-W2-A
28
© Kohler Mira Limited, February 2006
(1609)
Page 27
Page 28
Image 28
Page 27
Contents
Installation and User Guide
These instructions are to be left with the user
BUILT IN DUAL CONTROL SHOWER VALVE
CONTENTS
SAFETY WARNINGS
INTRODUCTION
PACK CONTENTS
DIMENSIONS
Note! All Dimensions are Nominal
SPECIFICATIONS
Temperatures
Pressures
Flow Rates
Connections
Thermostatic Shut-down
INSTALLATION REQUIREMENTS
Key to symbols
Gravity fed system
Gas heated system
Mains pressurised instantaneous
hot water system thermal store
Pumped system
The shower can be installed with a
INSTALLATION
General
Installation Methods
Using Securing Brackets - Mounting off Front Face
1. Solid Wall or Stud Partition
1.9Drill three 6 mm holes for the wall plugs
Spirit Level Building-in Shroud Securing Screws
Minimum Building-inDepth Maximum Building-inDepth
Using Rear Fixing Points on Shower Control
2. Solid Wall or Stud Partition
Page
Using Securing Brackets - Mounting off Rear Face
3. Laminated Panel
Warning! Do not drill or screw here
M5 Fixing Holes Securing Screws
Control Assembly
Push up and Latch over the Top of the Backplate
‘Commissioning’
Align Flow Lever as Shown ‘Click’ into Position
Reversed Supplies
Maximum Temperature Setting
COMMISSIONING
OPERATION
Temperature Knob
Flow Control Lever OFF ON
COLD
FAULT DIAGNOSIS
SYMPTOM
CAUSE/RECTIFICATION
and ‘Commissioning’
MAINTENANCE
Cleaning
Lubricants
Filters
SPARE PARTS
G E C, K, J K, J A
D D C D
L I J
CUSTOMER SERVICE
1058366-W2-A
1609
Kohler Mira Limited, February