Land Pride | Table of Contents |
Section 1: Assembly and
Front Guard Assembly
Front Rubber Guard Installation
Refer to Figure
1.Install center rubber guard (#5) with 3/8” x 1” long carriage bolts (#4). Secure with 3/8” flange nuts (#3).
2.Install left and right side rubber guards (#2) with 3/8” x 1” long carriage bolts (#4). Secure with 3/8” flange nuts (#3).
3.Tighten all 3/8” flange nuts (#2) to 31
24656 |
Front Rubber Guard
Figure
Front Chain Guard Installation (Optional)
Refer to Figure
1.Install center chain guard (#1) with 3/8” x 1” long carriage bolts (#4). Secure with 3/8” flange nuts (#3).
2.Install left and right chain guards (#2) with 3/8” x 1” long carriage bolts (#4). Secure with 3/8” flange nuts (#3).
3.Tighten all 3/8” flange nuts (#2) to 31
24657 |
Front Chain Guard
Figure
9/24/08 | RCR1884 Series Rotary Cutters | 13 |