Before starting Peg Survey
Data uploading using "Mining Editor"
•Station coordinates (East, North, Height, Grade elevation)
•Backsight point coordinates (East, North, Height, Grade elevation)
•Tolerances, sequence, number of sets
•Job definition
Uploading of fixpoint coordinates, tolerances, sequence and number of sets is mandatory to enable the operation of "Peg Survey".
To create new jobs on board the instrument, a set of tolerance must be available.
TPS400 Mining | 7 | Peg Survey |