TPS400 Mining Manual-1.0.0en Peg Survey
8
Start and execution Peg Survey
> Step 3 Choose "Start" by
pressing [F4], then
enter point number
(PtID) and
instrument height
(hi) for the station.
The sign for the
instrument height
(hi) is normally
negative.
> Step 4 [SET]
Set Point number
(PtID) and
instrument height
(hi).
[EXIT] Leaves "Input
Station" and returns
to the start-up menu.
Press [MENU] and [F1] for
programs.
Press [F1] for Peg Survey.
> Step 1 Select a job.
> Step 2 Confirm the set of
tolerances.