Results, continued | Saving data |
> Step 6
If the sign is negative the grade point are above the measure point.
If the sign is positive the grade point are below the measure point.
Turn the telescope until the height difference (dHgt) is zero, then repeat the measurement
(> Step 5 ).
The following result data are stored in the internal memory:
Measurement data: | Coordinates of new gradeline | |||
PtID: | Point number | point: |
| |
|
| |||
Hz: | Horizontal angle | E: | Easting | |
|
| |||
V: | Vertical angle | N: | Northing | |
|
| |||
HD: | Horizontal distance | H: | Height | |
|
| |||
SD: | Slope distance | Grades Result: | ||
dH: | Height difference | |||
daH: | Stake out height | |||
|
| |||
|
|
| difference | |
|
| daHD: | Horizontal distance | |
|
|
| along the foresight | |
|
|
| line | |
|
| Grd: | Slope gradient | |
|
| GE: | Grade elevation |
TPS400 Mining | 22 | Grades |
|