11 - Are flame rollout switches tripped? If flame rollout switches are tripped, call the service technician for in spection.
Heating Sequence Of Operation
(follow steps below or see Figure 29 for more detail)
1 - When thermostat calls for heat, combustion air blower starts.
2 - Combustion air pressure switch proves blower opera tion. Switch is
3 - After a
4 - After a
5 - Gas is ignited, flame sensor proves the flame, and the combustion process continues.
6 - If flame is not detected after first ignition trial, the igni tion control will repeat steps 3 and 4 four more times before locking out the gas valve (“WATCHGUARD” flame failure mode). The ignition control will then auto matically repeat steps 1 through 6 after 60 minutes.
7 - To interrupt the
Gas Pressure Adjustment
Gas Flow (Approximate)
TABLE 8
GAS METER CLOCKING CHART
| Seconds for One Revolution | ||||
|
|
|
|
|
|
EL180UHE Unit | Natural |
| LP | ||
|
|
|
|
| |
1 cu ft | 2 cu ft | 1 cu ft |
| 2 cu ft | |
|
| ||||
| Dial | Dial | Dial |
| DIAL |
|
|
|
|
|
|
80 | 160 | 200 |
| 400 | |
|
|
|
|
|
|
55 | 110 | 136 |
| 272 | |
|
|
|
|
|
|
41 | 82 | 102 |
| 204 | |
|
|
|
|
|
|
33 | 66 | 82 |
| 164 | |
|
|
|
|
|
|
27 | 54 | 68 |
| 136 | |
|
|
|
|
| |
Furnace should operate at least 5 minutes before check ing gas flow. Determine time in seconds for two revolu tions of gas through the meter. (Two revolutions assures a more accurate time.) Divide by two and compare to time in table 8. If manifold pressure matches table 10 and rate is incorrect, check gas orifices for proper size and restric tion. Remove temporary gas meter if installed.
NOTE - To obtain accurate reading, shut off all other gas appliances connected to meter.
Supply Pressure Measurement
A threaded plug on the inlet side of the gas valve provides access to the supply pressure tap. Remove the threaded plug, install a
Manifold Pressure Measurement
1 - Remove the threaded plug from the outlet side of the gas valve and install a
2 - Start unit and allow 5 minutes for unit to reach steady state.
3 - While waiting for the unit to stabilize, observe the flame. Flame should be stable and should not lift from burner. Natural gas should burn blue.
4 - After allowing unit to stabilize for 5 minutes, record manifold pressure and compare to value given in table 10.
NOTE - Shut unit off and remove manometer as soon as an accurate reading has been obtained. Take care to remove barbed fitting and replace threaded plug.
Proper Combustion
Furnace should operate a minimum 15 minutes with cor rect manifold pressure and gas flow rate before checking combustion. Take combustion sample beyond the flue out let and compare to the tables below. The maximum car
bon monoxide reading should not exceed 50 ppm.
TABLE 9
EL180UHE Unit | CO2% For | CO2% For | |
Nat | L.P. | ||
| |||
|
| ||
|
|
| |
|
| ||
|
|
| |
7.2 - 7.8 | 7.5 - 9.0 | ||
|
| ||
|
|
| |
|
| ||
|
|
| |
|
|
| |
High Altitude |
|
| |
|
|
|
The manifold pressure may require adjustment and com bustion air pressure switch may need replacing to ensure proper combustion at higher altitudes. Refer to table 10 for manifold pressure and table 11 for pressure switch change and gas conversion kits.
IMPORTANT
For safety, shut unit off and remove manometer as soon as an accurate reading has been obtained. Take care to replace pressure tap plug.
Page 27