Lennox International Inc EL180UHE Start-Up& Performance Check List, UNIT SET UP typical

Models: EL180UHE

1 32
Download 32 pages 29.07 Kb
Page 31
Image 31
Start-Up & Performance Check List

Start-Up & Performance Check List

UNIT SET UP

(typical)

2

2

Unit Model Number_______________

Serial Number___________________

Line Voltage

5

SUPPLY

AIR

upflow furnace shown

1

Gas Supply Pressure

1

4

3

Filter

RETURN

AIR

1GAS SUPPLY

Natural Gas

LP/Propane Gas

Piping Connections Tight

Leak Tested

Supply Line Pressure “ W.C.________

2VENT / EXHAUST PIPE

Secure to Unit

Elbows Secured to Pipe

Roof Flashing (water tight)

Vent Pipe Supported

3DUCT SYSTEM

SUPPLY AIR DUCT

Sealed

Insulated (if necessary)

Registers Open and Unobstructed

RETURN DUCT

Sealed

Filter Installed and Clean

Grilles Unobstructed

4INTEGRATED CONTROL

DIP Switches Set (if applicable) Appropriate Links in Place (if applicable)

5VOLTAGE CHECK Supply Voltage _____

Electrical Connections Tight

Page 31