Troubleshooting: Heating Sequence of Operation (Continued)
| HEATING SEQUENCE OF OPERATION |
|
|
| |||
CONTINUED |
|
| SEE BOX A |
| |||
|
|
| NORMAL OPERATION. |
| |||
|
|
| SEE BOX B |
|
| ||
|
|
| THERMOSTAT CALLS FOR HEAT. |
| |||
|
|
| RETURN TO FIRST−STAGE HEAT MODE. |
| |||
|
|
| FIRST−STAGE CONTINUES UNTIL SECOND− |
| |||
SECOND−STAGE (HIGH FIRE) HEAT | NO | STAGE PRESSURE SWITCH CAN BE PROVEN | YES | ||||
or HEAT DEMAND IS SATISFIED. A FIVE (5) | |||||||
PRESSURE SWITCH CLOSED? |
|
| |||||
| MINUTE WAIT PERIOD IS INITIATED BEFORE |
| |||||
|
|
|
| ||||
YES |
|
| RETRY. WERE 5 ATTEMPTS MADE FOR |
| |||
|
| SECOND−STAGE HEAT? |
| ||||
|
|
|
| ||||
HEAT DEMAND SATISFIED? |
|
| NO |
|
| ||
STATUS LED −− HEARTBEAT. |
|
|
| SEE BOX C |
| ||
|
|
| FIRST−STAGE HEAT DEMAND SATISFIED? |
| |||
YES | YES |
|
|
|
|
| |
SINGLE−STAGE THERMOSTAT MODE | TWO STAGE THERMOSTAT MODE? |
|
|
| |||
(DIP SWITCH SET AT |
| (DIP SWITCH SET AT |
|
|
| ||
YES |
|
| YES |
|
|
| |
|
| FIRST AND SECOND STAGE HEAT |
| SECOND STAGE HEAT | |||
GAS VALVE OFF, COMBUSTION AIR | YES | NO | DEMAND SATISFIED? | ||||
INDUCER OFF AFTER 5−SECOND | DEMAND SATISFIED SIMULTANEOUSLY. | STATUS LED −− HEARTBEAT. | |||||
LOW SPEED POST PURGE PERIOD, |
| STATUS LED −− HEARTBEAT. |
|
|
| ||
INDOOR BLOWER OFF DELAY |
|
|
|
|
|
| |
INITIATED ON LOW HEAT SPEED. |
|
|
|
| YES |
| |
STATUS LED −− HEARTBEAT. |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
| GAS VALVE, COMBUSTION AIR INDUCER | ||||
|
|
| AND INDOOR BLOWER RETURN TO FIRST− | ||||
|
|
|
| STAGE OPERATION. |
| ||
|
|
|
| STATUS LED −− HEARTBEAT. |
| ||
|
|
| FIRST STAGE HEAT DEMAND SATISFIED? | ||||
|
|
|
|
| YES |
| |
DEMAND FOR HEAT SATISFIED. |
|
| GAS VALVE OFF. COMBUSTION AIR INDUCER | ||||
|
| OFF AFTER 5−SECOND LOW SPEED POST− | |||||
POWER ON STAND BY. |
|
| |||||
|
| PURGE PERIOD. INDOOR BLOWER OFF. | |||||
STATUS LED −− PULSE. |
|
| |||||
|
| DELAY INITIATED ON LOW HEAT SPEED. | |||||
|
|
| |||||
|
|
|
| STATUS LED −− PULSE. |
|
Page 47