Manuals
/
Lennox International Inc
/
Household Appliance
/
Electric Heater
Lennox International Inc
MERIT SERIES GAS FURNACE DOWNFLOW AIR DISCHARGE, ML193DF
Models:
MERIT SERIES GAS FURNACE DOWNFLOW AIR DISCHARGE
ML193DF
1
35
52
52
Download
52 pages
25.88 Kb
32
33
34
35
36
37
38
39
<
>
Specifications
Repair Parts List
Typical ML193DF Wiring Diagram
Diagnostic Codes
BAG Assembly
Joint Cementing Procedure
Gas Pressure Adjustment
Setting Equipment
Temperature Rise
Safety
Page 35
Image 35
TYPICAL ML193DF WIRING DIAGRAM
FIGURE 52
Page 35
Page 34
Page 36
Page 35
Image 35
Page 34
Page 36
Contents
Table of Contents
Installation Instructions ML193DF
ML193DF
ML193DF Unit Dimensions − inches mm
Blower Motor
BAG Assembly
ML193DF Parts Arrangement
Control BOX
Shipping and Packing List
Safety Information
Direct Vent Installation NON−DIRECT Vent
ML193DF Gas Furnace
Use of Furnace as Construction Heater
Combustion, Dilution & Ventilation Air
General
Equipment in Confined Space − ALL AIR from Inside
Equipment in Confined Space − ALL AIR from Outside
Shipping Bolt Removal
Front Horizontal Back
Installation − Setting Equipment
Setting Equipment
NC‡
NON−COMBUSTIBLE Floor Opening Size
− Seal the cabinet and check for air leaks
Combustible Flooring Base Opening Size
Side View
Duct System
Pipe & Fittings Specifications
Piping and Fittings Specifications
Filters
Outdoor Termination Kits Usage
Schedule
Joint Cementing Procedure
Venting Practices
Piping Suspension Guidelines
ML193DF MIN. Vent Length Model
Vent Piping Guidelines
Minimum Vent Pipe Lengths
Maximum Allowable Intake or Exhaust Vent Length in Feet
Intake Exhaust
Typical Exhaust Pipe Connections
Typical Intake Pipe Connections
Typical AIR Intake Pipe Connections
Inches 305mm or 12 in mm
Inside Corner Detail
US Installations1 Canadian Installations2
FLUSH−MOUNT Side Wall Termination KIT 51W11
− On field supplied terminations, a minimum distance
Direct Vent Roof Termination KIT
51mm 76mm Vent Pipe
Support
Reducer MAY be
Required to Adapt
Unconditioned Space
Top View
Front View
Exhaust
NON−DIRECT Vent Roof Termination KIT
203mm − 305mm
ML193DF NON−DIRECT Vent Application Using Existing Chimney
To drain
ML193DF with Evaporator Coil
Trap / Drain Assembly Using 1/2 PVC or 3/4 PVC
Furnace Isolate GAS Valve
Gas Piping
GAS Pipe Capacity − FT3/HR kL/HR
Electrostatic Discharge ESD
Precautions and Procedures
Electrical
BOX Inside
FACTORY− Installed Left Side MAKE−UP
Interior MAKE−UP BOX
Exterior MAKE−UP BOX
Thermostat Designations
Typical ML193DF Field Wiring Diagram
Typical ML193DF Wiring Diagram
Automatic Hot Surface Ignition System
For Your Safety Read Before Operating
Unit Start−Up
Integrated Control
Page
High Altitude Information
Gas Pressure Adjustment
GAS Meter Clocking Chart
Proper Combustion
73W37 73W81 68W68 74W90 74W91 69W73
2286 − 3038m
2286m 3048m
No Jumper
Other Unit Adjustments
Heat FAN-OFF Time in Seconds
High Low In. w.g Cfm Watts Cfm Watts cfm Watts
Blower Data
Electrical SHOCK, Fire Or Explosion Hazard
Service
Page
LED #1 Red LED #2 Green
Planned Service
Ignition Control Board Diagnostic Codes
Diagnostic Codes
Heating Sequence of Operation
Troubleshooting Heating Sequence of Operation
Normal Heating Mode Abnormal Heating Mode
Heating Sequence
Cooling Sequence of Operation
Troubleshooting Cooling Sequence of Operation
Normal Cooling Mode Abnormal Cooling Mode
Continuous Heat Speed FAN Sequence of Operation
Troubleshooting Continuous Fan Sequence of Operation
Repair Parts List
Intake / Exhaust Pipe
Start−Up & Performance Check List
GAS Supply
Return AIR Duct System Supply AIR Duct
Vent Pipe
Temperature Rise
Total External Static Drain Line
Condensate Line Thermostat
LY BELOW. Keep Clear of ALL OBSTRUC- Tions
Requirements for Commonwealth of Massachusetts
Top
Page
Image
Contents