
2-1-2. 19-Inch Wiring Closet Rail Installing
Fig.
Caution: Allow a proper spacing and proper air ventilation for the cooling fan at both sides of the chassis.
⇒Wear a grounding device for electrostatic discharge.
⇒Screw the mounting accessory to the front side of the switch (See Fig.
⇒Place the Chassis into the
2-1-3. Cabling Requirements
To help ensure a successful installation and keep the network performance good, please take a care on the cabling requirement. Cables with worse specification will render the LAN to work poorly.
10