Lexicon 20/20 AD manual These instructions are for use by qualified personnel only, Word Clock

Models: 20/20 AD

1 31
Download 31 pages 57.43 Kb
Page 14
Image 14

Using the 20/20 AD

Lexicon

 

CAUTION

These instructions are for use by qualified personnel only.

Before opening the 20/20 AD, REMOVE THE POWER CORD. You may be exposed to hazardous voltages even if power to the unit is turned off.

WARNING

Turn off power and REMOVE THE POWER CORD

before opening the unit.

Take a moment to study the figure below. This diagram shows the terminating and grounding of input signals for the unit, and explains the function of most of the jumpers on the 20/20 AD Main pc board. The configuration shown illustrates the jumper settings when the 20/20 AD is shipped from the factory.

 

XLR

 

CHASSIS GROUND

 

 

 

 

 

 

 

 

CONNECTOR

ANALOG IN

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

W1

 

 

 

 

 

W9

 

 

 

2

 

+

 

 

 

 

W11

 

 

 

3

 

-

XLR

 

 

600 OHM

W13

 

 

W2

 

 

CONNECTOR

 

 

W10

 

 

 

AES OUT

 

 

W12

 

 

 

 

 

 

W14

 

 

 

 

 

 

 

 

 

 

1

SHIELDED

 

 

 

 

W26

2

 

 

 

 

W27

3

TWISTED PAIR

 

 

 

 

 

 

 

 

AES SYNC IN

 

 

 

SHIELDED

 

 

 

 

 

 

 

 

 

 

 

 

TWISTED PAIR

 

 

1

 

 

W18

 

 

 

2

 

 

 

RCA

 

 

3

 

 

 

CONNECTOR

 

 

 

 

 

S/PDIF OUT

 

 

W17 110 OHM

 

 

 

XLR

 

 

 

 

 

 

CONNECTOR

 

 

 

 

 

 

 

 

 

 

 

75 OHM

 

BNC

 

 

 

SYSTEM GROUND

COAXIAL

 

 

 

 

 

 

CONNECTOR

WORD CLOCK IN

 

 

 

 

 

 

 

 

 

J13

 

 

 

 

 

 

 

 

75 OHM

 

W16

 

 

 

 

COAXIAL

 

 

 

 

 

 

 

75 OHM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHASSIS CONNECTED TO

 

 

 

 

 

 

EARTH GROUND

 

 

 

 

 

 

THROUGH POWER CABLE

 

 

 

 

 

 

OR GROUND STRAP

Jumper settings

(as set at the factory)

10

Page 14
Image 14
Lexicon 20/20 AD manual These instructions are for use by qualified personnel only, Word Clock