48

82

69

116

LAT CABLE 42

FIGURE 22

STEP 22:

30

90

3/8 X 2-3/4”

Route the threaded end of the LAT CABLE (42) through the TOP BOOM (30) as shown in FIGURE 22.

SECURELY assemble two 4-1/2” PULLEYS (48) into the slots of the TOP BOOM (30) using two 3/8 X 2-3/4” BOLTS (90), four 3/8” FLANGE SPACERS (69), two 2-7/8” X 2-1/4” CABLE CLIPS (116) and two 3/8” LOCK NUTS (82).(NOTE: Loop the cable around each pulley prior to inserting it in the the slot.)

82

80

55

48

STEP 23:

SECURELYassemble one 4-1/2” PULLEY (48) to the FLOATING PULLEY BRACKET (55) using one 3/8 X 2” BOLT (89), two 3/8” WASHERS (80), two 2-7/8 X 1” CABLE CLIPS (67) and

67one 3/8” LOCK NUT (82) as shown in FIGURE 23.

Apply two 1 X 1” GLIDES (60) to the FLOATING PULLEY BRACKET (55) as shown.

60

 

 

 

FIGURE 24

 

 

 

 

 

 

 

 

 

FIGURE 23

3/8 X 2” 89

 

 

 

 

 

 

 

 

 

 

 

 

STEP 24:

 

 

 

 

 

 

48

SECURELY assemble one 4-1/2” PULLEY (48) to the FLOATING

 

82

 

 

 

 

PULLEY STOP (10) using one 3/8 X 2-3/4” BOLT (90), one 2-7/8” X

 

 

 

 

 

 

69

2-1/4” CABLE CLIP (116), two 3/8” FLANGE SPACERS (69), and

 

 

 

 

 

 

 

one 3/8” LOCK NUT (82) as shown in FIGURE 24.

 

 

 

 

 

 

 

 

 

 

 

116

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

3/8 X 2-3/4” 90

0

1/2

1/2

1/2

1/2

1/2

 

1/2

 

1

2

3

4

5

6

 

 

 

 

22

 

 

 

Page 22
Image 22
Life Fitness 8500 3 manual LAT Cable