48
82
69
116
LAT CABLE 42
FIGURE 22
STEP 22:
30
90
3/8 X
•Route the threaded end of the LAT CABLE (42) through the TOP BOOM (30) as shown in FIGURE 22.
•SECURELY assemble two
82
80
55
48
STEP 23:
•SECURELYassemble one
67one 3/8” LOCK NUT (82) as shown in FIGURE 23.
•Apply two 1 X 1” GLIDES (60) to the FLOATING PULLEY BRACKET (55) as shown.
60 |
|
|
| FIGURE 24 |
|
| |
|
|
|
|
|
|
| |
FIGURE 23 | 3/8 X 2” 89 |
|
|
|
|
| |
|
|
|
|
|
|
| |
STEP 24: |
|
|
|
|
|
| 48 |
• SECURELY assemble one |
| 82 |
| ||||
|
|
| |||||
PULLEY STOP (10) using one 3/8 X |
|
|
| ||||
|
|
| 69 | ||||
|
|
| |||||
|
|
|
| ||||
one 3/8” LOCK NUT (82) as shown in FIGURE 24. |
|
|
|
| |||
|
|
|
|
|
|
| 116 |
|
|
|
|
|
|
| 11 |
|
|
|
|
|
|
| 3/8 X |
0 | 1/2 | 1/2 | 1/2 | 1/2 | 1/2 |
| 1/2 |
| 1 | 2 | 3 | 4 | 5 | 6 | |
|
|
|
| 22 |
|
|
|