SEE DETAIL 31
FIGURE 31
STEP 31:
29
50
45 AB CABLE
82
69
90 3/8 X | 48 |
DETAIL 31
•Securely assemble the ball end of the AB CABLE (45) and one
|
|
| 82 |
| 26 |
|
|
STEP 32: |
|
| AB CABLE 45 |
|
| ||
|
|
|
|
| |||
|
|
|
|
|
|
| |
• Route the AB CABLE (45) around the FLOATING PULLEY | 80 |
|
|
| |||
BRACKET (55) using one |
|
|
| ||||
67 |
|
|
| ||||
BOLT (89), two |
|
|
| ||||
ERS (80), and two 3/8” LOCK NUTS (82). See FIGURE 32. |
|
|
|
| |||
• Screw the threaded end of AB CABLE (45) approximately 1” into |
| 55 |
|
| |||
|
|
|
| ||||
the end of the PULLEY BRACKET (26) and tighten jam nut se- |
|
|
|
| |||
curely as shown in FIGURE 32. |
|
|
|
|
|
| |
IMPORTANT! Make sure the cables are running |
|
|
|
|
| ||
| in the grooves of all pulleys. |
|
|
|
|
| |
|
|
|
|
|
|
| 3/8 X 2” 89 |
|
|
|
|
|
|
| FIGURE 32 |
0 | 1/2 | 1/2 | 1/2 | 1/2 | 1/2 |
| 1/2 |
1 | 2 | 3 |
| 4 | 5 | 6 | |
|
|
| 26 |
|
|
|
|