Mounting | Radar Tank Gauge |
|
|
3.2Incoming acceptance, transport, storage
3.2.1Incoming acceptance
Check the packing and contents for any signs of damage.
Check the shipment, make sure nothing is missing and that the scope of supply matches your order.
3.2.2Transport
Caution!
Follow the safety instructions and transport conditions for instruments of more than 18 kg. Do not lift the measuring instrument by its housing in order to transport it.
3.2.3Storage
Pack the measuring instrument so that is protected against impacts for storage and transport. The original packing material provides the optimum protection for this. The permissible storage temperature is
12 | Installation and Operations Manual |