DOMESTIC WATER HEATERS
HYDRONIC HEATING BOILERS and
495,000 - 2,065,000 Btu/hr MODELS
Save this manual for future reference
Table of Contents
Table of Contents
Warranty
SAFETY INFORMATION
GENERAL PRODUCT INFORMATION
Special Instructions
3.Boilers and water heaters are heat producing appliances. To avoid damage or injury, do not store materials against the appliance or the vent-airintake system. Use proper care to avoid unnecessary contact especially children with the appliance and vent-airintake components. Follow all clearances from combustibles contained in this manual
PRODUCT IDENTIFICATION
Front View Rear View
Figure 1 - Front and Rear View
LOCATING UNIT
INSTALLATION
Clearances from Combustible Construction
Base for Combustible Floors
FREEZE PROTECTION
Outdoor Boiler Installation
Hydronic System Antifreeze
Shut-Downand Draining
COMBUSTION AND VENTILATION AIR
Installing Combustion Air Filter
Combustion Air Filter
INSTALLATION
2. Outside Combustion Air, Using Ducts
Combustion Air Options
One Opening
Figure 7 - Outside Combustion Air - Two Openings
General Information
INSTALLATION VENTING
Exhaust Fans
Venting Support
Parapet Wall
TABLE-A Flue Pipe Sizes
TABLE - B Flue Pipe Sizes
Vent System Options
TABLE-C
Barometric Damper Location
1.Conventional Negative Draft Venting
Negative Draft
Flue Outlet Piping
INSTALLATION
2. Outdoor Installation Venting
Vertical Vent Termination Clearances and Location
Inspection of a Masonry Chimney
Outdoor Vent Kits
TABLE - D
Outdoor Vent/Air Inlet Location
The Outdoor Vent Kit
Gas Pressure Test
CONNECTING TO GAS SUPPLY
Gas Piping
TABLE - E Inlet Pressure
Gas Train and Controls
Connecting Gas Piping to Unit
TABLE-F
TABLE-F
Checking Gas Supply Pressure
Combination Gas Valves
TABLE - H
INSTALLATION
Gas Manifold Pressure Adjustment
Inlet and Outlet Connections
CONNECTING TO WATER SUPPLY
TABLE - NET MANIFOLD PRESSURE
Regulator Pressure Less Front Chamber Pressure
Water Flow Switch
CONNECTING TO ELECTRICAL SUPPLY
Low Water Cutoff
Relief Valve
TABLE - J Nominal AMP Draw Data
Terminal Strip Connection Options
AMP Draw Data
INSTALLATION
BOILER SYSTEM PIPING
Water Connections Heating Boilers Only
General Plumbing Rules
Circulator Pump Specifications
Heat Exchanger Pressure Drop Chart
Pump Installation and Maintenance
Primary/Secondary Boiler Piping
Radiant Floor and Snow Melt Heating Systems
Low Temperature Return Water Systems
Table - K LTV Valve Kits
495,000 - 745,000VAL3048
System Temperature Risased on Btu/hr Input
Installation with a Chilled Water System
TABLE - L
INSTALLATION
Boiler Flow Rate
Temperature/Pressure Gauge
Boiler Bypass Requirements
Filling the System
OPERATION
FOR YOUR SAFETY READ BEFORE OPERATING
WATER TREATMENT
Lighting Instructions
SETTING TEMPERATURE CONTROL
Locating Temperature Control
To Turn Off Gas To Appliance
TABLE - M
Temperature Control Settings
TABLE-L
Maximum Set Point Determination Setpoint
High-FireOffset
Outdoor Air Reset Option
Shutdown
Outdoor Air Max O.A. Max
Placement of Sensors
Temperature Control Sensors
Boiler Application
Water Heater Application
HOT SURFACE IGNITION SYSTEM
TABLE - N Remote Wire Connection
Hot Surface Igniter and Ignition Control Module
Remote Mounting of Sensor
Ignition and Control Timings
Hot Surface Ignition Control Module
Diagnostic Status Indication
OPERATION
OPERATION AND DIAGNOSTIC LIGHTS
TABLE - O Status LED Diagnostic Codes
TABLE - P Status LED Diagnostic Codes
TABLE - Q Temperature Rise Chart
Required Temperature Rise
DOMESTIC WATER HEATERS
Water Velocity Control
ABLE-P Pipe Sizing Chart
TABLE - R Pipe Sizing Chart
Water Chemistry
Circulating Pump
Domestic Water Temperatures
Potable Hot Water Temperature Control Settings
DOMESTIC WATER
Minimum Pump Performance
Location of Cold Water Supply Piping Connections
High Water Temperature Limit Control
Optional Relief Valve
Thermal Expansion
Flue Gas Passageways Cleaning Procedures
CLEANING AND MAINTENANCE
Burner Removal and Cleaning
Appliance Area
Fan Cleaning
Heat Exchanger Cleaning
Combustion Air Fan Adjustment
Adjusting Differential Air Pressure
CLEANING AND MAINTENANCE CONTINUED
Figure 43 - Air Pressure Switch
Figure 44 - Adjusting Air Shutter
Figure 47 - Adjusting Air Shutter
Servicing Hot Surface Igniter and Ignition Module
SEQUENCE OF OPERATION
Ignition System Checkout
CLEANING AND MAINTENANCE CONTINUED
ON/OFF Rocker Switch
Power Supply
Manual Reset High-LimitThermostat
Safety Device Terminals
Electronic Temperature Controller
Ignition Module
Heat Transfer Process Gas Valves, Burner
DISCONNECT POWER BEFORE SERVICING THE UNIT
SCHEMATIC DIAGRAM
MODELS 495,000 - 745,000
BTU/HR
HI-LIMITS- PWR SW
OPERATOR
MAIN UNIT - GAS VALVES - BLOWER PRESSURE SWITCH
OPTIONAL I/O RESET
CN7 OPERATOR
SCHEMATIC AND
WIRING DIAGRAM
MODELS 985,000
2,065,000 BTU/HR
WIRING DIAGRAM
CONTROL BOX CONNECTIONS
CONNECTION DIAGRAM A
WIRING BOX
CB-CWE-i&s-06 CP-5M-1/09