1-6-1 T2202DC
CABINET DISASSEMBLY INSTRUCTIONS

1. Disassembly Flowchart

This flowchart indicates the disass embly steps for the
cabinet parts, and the CBA in order to gain access to
item(s) to be serviced. When reassembling, follow the
steps in reverse order. Bend, route and dress the
cables as they were.

CAUTION!

When removing the CRT, be sure to discharge the
Anode Lead of the CRT with the CRT Ground Wire
before removing the Anode Cap.

2. Disassembly Method

Note:
(1) Order of steps in procedure. When reassembling,
follow the steps in reverse order. These numbers
are also used as the Identification (location) No. of
parts in figures.
(2) Parts to be removed or installed.
(3) Fig. No. showing procedure of part location
(4) Identification of parts to be removed, unhooked,
unlocked, released, unplugged, unclamped, or
desoldered.
P = Spring, L = Locking Tab, S = Screw,
CN = Connector
* = Unhook, Unlock, Release, Unplug, or Desolder
e.g. 2(S-2) = two Screws (S-2),
2(L-2) = two Locking Tabs (L-2)
(5) Refer to the following “Reference Notes in the
Tab le ”.
Step/
Loc.
No.
Part
Removal
Fig.
No.
Remove/*Unhook/
Unlock/Release/
Unplug/Unclamp/
Desolder
Note
[1] Rear
Cabinet D1 6(S-1), (S-2), (S-3A),
(S-3B) ---
[2] Tray
Chassis
Unit
D2
D3
D5
Anode Cap, *CN2501,
CRT CBA, *CN1601,
*CN3802, *CN2571,
*CN3801
1
[3] CRT D3
D5 4(S-4) ---
[4] DVD
Mechanism
D2
D4
D5
4(S-5), *CN201,
*CN301 2, 3
[5] DVD Ma in
CBA Unit
D2
D4
D5 *CN1, *CN2 ---
[6] Sub CBA D2
D5 5(S-6), *CN1301,
*CN1602, *CL2601 ---
[7] Function
CBA D2
D5 *CN2401 ---
[1] Rear Cabinet
[3] CRT[2] Tray Chassis Unit
[4] DVD
Mechanism
[5] DVD Main
CBA Unit
[6] Sub CBA
[8] Deck Assembly
[9] Main CBA
[7] Function CBA
[8] Deck
Assembly D2
D5
3(S-7), Top Shield,
5(S-8), (S-9), (S-10),
*CL1201, *CL1401,
*CL1402, *CL1403
4
[9] Main CBA D2 5(S-11) ---
(1)
(2)
(3)
(4)
(5)
Step/
Loc.
No.
Part
Removal
Fig.
No.
Remove/*Unhook/
Unlock/Release/
Unplug/Unclamp/
Desolder
Note