MartinLogan E2 manual Transition/Electrostatic Tower Assembly

Models: E2

1 32
Download 32 pages 200 b
Page 10
Image 10
Transition/Electrostatic Tower Assembly

Transition/Electrostatic Tower Assembly

Note: The following instructions describe the assembly of the right channel high-and mid-frequency tower. Duplicate all assembly instructions for the left tower assembly.

1 Attach the outside (semi-circle shaped) trim rail to the transition tower by aligning the five pins on the trim rail with the 5 cam holes in the tower.

Figure 15

2 Use a phillips head screwdriver to rotate the cams a little over 180° counter clockwise once the pin is properly aligned in the cam. The arrow on the cam must be in the position shown to accept the pin.

Figure 16

3 Make sure the trim rail is flush with the tower edge.

Figure 17

10 Assembly

Page 10
Image 10
MartinLogan E2 manual Transition/Electrostatic Tower Assembly