18 Use a level to plumb the electrostatic panel left-to- right.

Figure 32

19 Measure the space between towers (top and bottom). The space should measure exactly 2 inches.

Figure 33

20 Tighten frame bolts as shown.

Figure 34

16 Assembly

Page 16
Image 16
MartinLogan E2 manual Tighten frame bolts as shown