Arranging the Cables and attaching the Sheets, the Tape, the Space PWB Hold MP and the Insulation Sheet

1.Connect the five Cables to the five Connectors. (Main PCB: CN6, CN9, CN10, CN51, CN54)

2.Attach the three Sheets, the Tape, the Space PWB Hold MP and the Insulation Sheet.

Connect the Connector CN51.

Connect the Connector CN54.

View "A"

Attach the Sheet in condition that the IO FPC is slid to the side of the Connector CN10.

Sheet

IO FPC

Sheet

View "B"

View "D"

View "C"

Connect the

Connector CN10.

 

Tape

Sheet

Space PWB

 

Hold MP

 

Insulation Sheet

View "A"

Safety Working

Wireless Module Holder

Do not put up the Cable on the Wireless Module Holder.

Cable

Pass the Cable through the right side of the Connector not to put up it on the Connector.

Connector CN51

View "D"

1~2mm

IC

Tape

0~1mm

 

Space PWB

 

Hold MP

 

Insulation Sheet

 

0~0.5mm

 

0.5~1.5mm

View "C"

TP PCB

Sheet

 

Cable

0~1mm

 

1~2mm

0~1mm

 

View "B"

Power SW Cable

CON Spacer

Cable

 

0~1mm

 

Sheet

0~1mm

 

 

3~4mm

Connect the Connector CN9.

Connect the Connector CN6.

7-28

Page 46
Image 46
Matsushita CF-29N3LGZBM manual View D View C