4. Maintenance

4.2 UPS replacement

Fault-tolerant connection module

Before carrying out this operation, the supply of power to the connected equipment must be cut. The equipment will therefore no longer be powered.

Disconnection:

 

1.

Shut down the UPS by pressing button 24 (return to the OFF

 

position).

 

2.

Open the battery circuit breaker(s) 8 .

24

3.

Open the upstream device (OFF position) controlling the

 

supply of AC power to the UPS.

 

4.

Remove the two fixing screws 31 and the connection module

 

from the UPS.

8

10

31

31

Reconnection:

1.Insert the connection module in the connector 10 and secure using the two screws 31 .

2.Close the upstream device (ON position) controlling the supply of AC power to the UPS.

3.Close the battery circuit breaker(s) 8 .

Check that UPS personalization settings still correspond to the equipment to be supplied (see section 3.5).

4. Start the UPS by pressing button 24 .

The connected equipment is again protected by the UPS.

51033211EN/AC - Page 27

Page 27
Image 27
MGE UPS Systems 2000 UPS replacement, Fault-tolerant connection module, Connected equipment is again protected by the UPS