HURSPK0026/00186 Page 5 of 21
Reconnect the
44.Replace the lock shaft through the
45.Replace the lock shaft bearing and
46.Replace
47.Remove the dome
48.Rotate the dome
49.Remove dome
50.Manually operate the dome to the “up” position.
51.Remove the shims from the bed of the press. Replace these shims into the kit with the rest of the shims. These shims may be needed later when shimming the downlocks.
52.Reinstall the diaphragm with the new expansion ring into the dome.
53.Turn on the
54.Tighten the nuts on the main bell air cylinder bolts.
55.Using manual functions, lower the main bell onto the bed.
56.Extend the down locks.
57.De-energize press power and lock off at main disconnect.
58.Check the “B” clearance between the top surface of the lock segment closest to the discharge end of the press and the bottom surface of the lock ring (see Figure 13). Take three (3) measurements - one (1) at each end, and one (1) in the middle of the segment. This is the most critical segment and must be shimmed first.
12