Manuals
/
Milnor
/
Laundry Appliance
/
Clothes Dryer
Milnor
KURSPK0025 manual Old Setup of Dome Full-Up Contact Switch and Bracket, HURSPK0026/00186
Models:
KURSPK0025
KURSPK0026
1
27
30
30
Download
30 pages
44.63 Kb
23
24
25
26
27
28
29
30
<
>
Troubleshooting
Install
Old Setup of Dome Full-Up Contact Switch and Bracket
B SETTING LIMIT SWITCHES Limit Switches-Including Microswitches
How to
DO NOT climb on press unless press power is locked OFF and tagged out
Publishing System TPAS Access date 03/06/03
Plunger Switch Angle
Using manual functions, lower the main bell onto the bed
Page 27
Image 27
HURSPK0026/00186
Page 18 of 21
Figure 10
Old Setup of Dome
Full-Up
Contact Switch and Bracket
25
Figure 11
Page 26
Page 28
Page 27
Image 27
Page 26
Page 28
Contents
Document ECNs Latest Available
Publishing System TPAS Access date 03/06/03
Kit Instruction KURSPK0025 KURSPK0026
Published Manual Number/ECN HURSPK0025/99503N
Trademarks of Pellerin Milnor Corporation
Please Read
References to Yellow Troubleshooting Pages
About the Manual Identifying Information on the Cover
Inspect switches regularly
B SETTING LIMIT SWITCHES Limit Switches-Including Microswitches
Will Be Damaged If Over-actuated
Limit Switch Types
Where Lever or Plunger Should Stop
Setting Switches
RIGHT
Plunger Switch Angle
RIGHT
ÎFree Position of Rotary Lever
FIGURE 5 MSSM0116AE
Roller Plunger Switch Angle
Roller can’t absorb sideways movement of target wrong switch used
RIGHT
Local codes may require additional precautions
PRESS SAFETY FOR INSTALLATION AND SERVICE General Safety Requirements
specific warnings, next page and throughout manual
Safety fence inclosing machine movement areas
Danger From a Descending Press Main Bell
Danger From Exposed Electrical Components
NEVER crawl or reach under the press main bell
Danger From an Operating Press
Danger From Moving Conveyor
DO NOT climb on press unless press power is locked OFF and tagged out
INSTRUCTIONS
INSTRUCTIONS FOR 50 KILO AND 60 KILO PRESS SHIM RETRO-FIT
19. With the dome in the “down” position, tag and lockout the power
HURSPK0026/00186 Page 2 of
10. Manually operate the dome to the up position
25. Lower the dome to the “down” position
26. With the dome in the “down” position, tag and lockout the power
HURSPK0026/00186 Page 3 of
23. Untag the machine and raise the dome to the “up” position
shaft bearing from the upper cross-member See Figure
HURSPK0026/00186 Page 4 of
HURSPK0026/00186 Page 5 of
52. Reinstall the diaphragm with the new expansion ring into the dome
55. Using manual functions, lower the main bell onto the bed
57. De-energize press power and lock off at main disconnect
HURSPK0026/00186 Page 6 of
measurements taken in steps 49 and
EXAMPLE
HURSPK0026/00186 Page 7 of
Main Bell Air Cylinder Bolts
Trace Outline of Main Bell Air Cylinder Base on Upper Cross Member
HURSPK0026/00186 Page 8 of
Torque To 25 ft-lb
Main Dome Coupling
33.9 Nm
HURSPK0026/00186 Page 10 of
Downlock Shims Placed on Bed in order to Shim Main Bell Air Cylinder
HURSPK0026/00186 Page 11 of
One of the Four Main Bell Air Cylinder Bolts
HURSPK0026/00186 Page 12 of
Main Bell Air Cylinder Shims
HURSPK0026/00186 Page 13 of
Right-Hand Side Lock Shaft Bearing Lock Shaft Spacers Left-Hand Side
Lock Shaft Bearing
HURSPK0026/00186 Page 14 of
HURSPK0026/00186 Page 15 of
Right-Hand Side Lock Shaft Bearing
HURSPK0026/00186 Page 16 of
Upper Cross-Member
Shaft Lock
Uplock Jaw
HURSPK0026/00186 Page 17 of
HURSPK0026/00186 Page 18 of
Old Setup of Dome Full-Up Contact Switch and Bracket
New Positioning of Dome Full-Up Contact Switch and Bracket
Dome Full-Up Contact Switch Bracket Dome Full-Up Contact Switch
HURSPK0026/00186 Page 19 of
HURSPK0026/00186 Page 20 of
HURSPK0026/00186 Page 21 of
Location of Downlock Shims Lock Ring Bolts