Troubleshooting
Install
Old Setup of Dome Full-Up Contact Switch and Bracket
B SETTING LIMIT SWITCHES Limit Switches-Including Microswitches
How to
DO NOT climb on press unless press power is locked OFF and tagged out
Publishing System TPAS Access date 03/06/03
Plunger Switch Angle
Using manual functions, lower the main bell onto the bed
Page 29
Image 29
HURSPK0026/00186 Page 20 of 21
Figure 13
27
Page 28
Page 30
Page 29
Image 29
Page 28
Page 30
Contents
Kit Instruction KURSPK0025 KURSPK0026
Publishing System TPAS Access date 03/06/03
Published Manual Number/ECN HURSPK0025/99503N
Document ECNs Latest Available
References to Yellow Troubleshooting Pages
Please Read
About the Manual Identifying Information on the Cover
Trademarks of Pellerin Milnor Corporation
Will Be Damaged If Over-actuated
B SETTING LIMIT SWITCHES Limit Switches-Including Microswitches
Limit Switch Types
Inspect switches regularly
Where Lever or Plunger Should Stop
Setting Switches
RIGHT
Plunger Switch Angle
ÎFree Position of Rotary Lever
RIGHT
Roller can’t absorb sideways movement of target wrong switch used
Roller Plunger Switch Angle
RIGHT
FIGURE 5 MSSM0116AE
specific warnings, next page and throughout manual
PRESS SAFETY FOR INSTALLATION AND SERVICE General Safety Requirements
Safety fence inclosing machine movement areas
Local codes may require additional precautions
NEVER crawl or reach under the press main bell
Danger From a Descending Press Main Bell
Danger From Exposed Electrical Components
DO NOT climb on press unless press power is locked OFF and tagged out
Danger From an Operating Press
Danger From Moving Conveyor
INSTRUCTIONS
INSTRUCTIONS FOR 50 KILO AND 60 KILO PRESS SHIM RETRO-FIT
10. Manually operate the dome to the up position
19. With the dome in the “down” position, tag and lockout the power
HURSPK0026/00186 Page 2 of
HURSPK0026/00186 Page 3 of
26. With the dome in the “down” position, tag and lockout the power
23. Untag the machine and raise the dome to the “up” position
25. Lower the dome to the “down” position
shaft bearing from the upper cross-member See Figure
HURSPK0026/00186 Page 4 of
55. Using manual functions, lower the main bell onto the bed
52. Reinstall the diaphragm with the new expansion ring into the dome
57. De-energize press power and lock off at main disconnect
HURSPK0026/00186 Page 5 of
EXAMPLE
HURSPK0026/00186 Page 6 of
measurements taken in steps 49 and
HURSPK0026/00186 Page 7 of
HURSPK0026/00186 Page 8 of
Main Bell Air Cylinder Bolts
Trace Outline of Main Bell Air Cylinder Base on Upper Cross Member
33.9 Nm
Torque To 25 ft-lb
Main Dome Coupling
HURSPK0026/00186 Page 10 of
Downlock Shims Placed on Bed in order to Shim Main Bell Air Cylinder
HURSPK0026/00186 Page 11 of
One of the Four Main Bell Air Cylinder Bolts
HURSPK0026/00186 Page 12 of
Main Bell Air Cylinder Shims
HURSPK0026/00186 Page 13 of
HURSPK0026/00186 Page 14 of
Right-Hand Side Lock Shaft Bearing Lock Shaft Spacers Left-Hand Side
Lock Shaft Bearing
HURSPK0026/00186 Page 15 of
Right-Hand Side Lock Shaft Bearing
Shaft Lock
Upper Cross-Member
Uplock Jaw
HURSPK0026/00186 Page 16 of
HURSPK0026/00186 Page 17 of
HURSPK0026/00186 Page 18 of
Old Setup of Dome Full-Up Contact Switch and Bracket
HURSPK0026/00186 Page 19 of
New Positioning of Dome Full-Up Contact Switch and Bracket
Dome Full-Up Contact Switch Bracket Dome Full-Up Contact Switch
HURSPK0026/00186 Page 20 of
HURSPK0026/00186 Page 21 of
Location of Downlock Shims Lock Ring Bolts