HURSPK0026/00186 Page 7 of 21

clearances (that is, the clearances which should result when the new shim thickness is added or subtracted from the readings obtained earlier) are within the permissible range.

67.When all shim segments have been installed, tighten all bolts (nine for the 50 Kg press, twelve for the 60 Kg press).

68.Energize the press. Using manual functions, cycle the downlocks from the retracted position to the extended position and back a few times.

69.Extend the downlocks, de-energize the press, and lock power off at the main disconnect.

70.Check and verify the “B” clearances (see Figure 13) are within the permissible range. If necessary, readjust the shims as directed in previous steps. If there is a major variation which results in some or all of the measurements being out of the permissible range, and the proper clearances cannot be achieved through shimming, contact the MILNOR service department or your MILNOR dealer.

71.Energize the press. Manually operate the press to make sure that everything is functioning properly.

Please follow the attached MILNOR directions on how to adjust the contact switches for the uplocks and dome full-up.

If you have any questions regarding the method of handling of this issue, please contact Technical Support at 504-467-9591, ext.276.