
Tank Assemblies LC0259 and LC0260
3403
2402
1 406
1 405
Assembly LC0259 Shown
Parts
408
5 407
401
404 4 5
ti12452a
1Use glass cloth tape to secure ground strap, thermal switch, and RTD to tank wall before adding heat blanket.
2Secure heat blanket to tank with string laced through eyelets.
3Insulation blanket should cover heat blanket completely. Secure insulation blanket to tank with 2 in. wide velcro strap.
4Apply thread sealant tape to male npt threads prior to installation.
5The RTD sensor assembly (404) should always be connected to side one of the M8 splitter harness (407). Side one is on the female/female end of connector and is marked with a molded imprint of the number “1”.
312394V | 47 |