mAINTENANCE

If, after making Blade Pitch adjustments the machine is still finishing poorly, blades, trowel arms, and trowel arm bushings may be suspect and should be looked at for adjustment, wear, or damage. See the following sections.

Stabilizer Ring Removal

5.To remove the outer stabilizer ring, (Figure 32), remove the six bolts at the end of each spider arm.

STABILIZER

 

RING

HEX NUT

 

HEX CAP

SCREW

ROD END

FLAT

WASHER

Figure 32. Stabilizer Ring Removal

6.Examine stabilizer ring for out of round or bends. If ring is damaged, replace ring. If ring is found to be correct with no damage, set aside.

Changing Blades

It is recommended that ALL the blades on the entire machine are changed at the same time. If only one or some of the blades are changed, the machine will not finish concrete consistently and the machine may wobble or bounce.

1.Place the machine on a flat, level surface. Adjust the blade pitch control to make the blades as flat as possible.

2.Note the blade orientation on the trowel arm. This is important for ride-on trowels as the two sets of blades counter-rotate. Lift the machine up, placing blocks under the main guard ring to support it.

3.Remove the bolts and lock washers (Figure 33) that secure the blade to the trowel arm, then remove the blade.

TROWEL

HEX CAP ARM

SCREW

WASHER

Figure 33. Blade Removal

4.Wire brush any build-up of concrete from all six sides of the trowel arm.This is important to properly seat the new blade. Repeat for the remaining arms.

5.Install the new blade, maintaining the proper orientation for direction of rotation.

6.Reinstall the bolts and lock washers.

7.Torque to 9 ft. lbs. (12.2 N.m)

8.Repeat steps 2-7 for all remaining blades.

page 34 — eHtx44y RIDE-ON TROWEL • operation manual — rev. #0 (01/16/13)