Multiquip GA-2.5H - PRE-INSPECTION, General Inspection Prior to Operation Ground Power Tools

Models: GA-2.5H

1 80
Download 80 pages 26.75 Kb
Page 21
Image 21
General Inspection Prior to Operation

General Inspection Prior to Operation

Ground Power Tools

When using power tools or electrical equipment requireing AC power from the generator, make sure connecting (power tool) cable (Figure 5) has a ground as shown in Figure.

GA-2.5HPRE-INSPECTION

Extension Cable

When electric power is to be provided to various tools or loads at some distance from the generator, extension cords are normally used. Cables should be sized to allow for distance in length and amperage so that the voltage drop between the generator and point of use (load) is held to a minimum. Use the cable selection chart (Table 4) as a guide for selecting proper cable size.

NOTE

Main Circuit Breaker

Never! use power tools or equipment that do not have a ground capability, the possibility exists of electrocution, electrical shock or burn, which can cause severe bodily harm or even

DEATH!

Figure 5. Ground Cables/Plugs

To protect the generator from an overload always place the main circuit breaker in the "OFF" position prior to starting the engine.

Table 4. Cable Selection (60 Hz, Single Phase Operation)

 

Load In

 

Maximum Allowable Cable Length

 

Current in

Watts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Amperes

At 120

#10 Wire

 

#12 Wire

 

#14 Wire

 

#16 Wire

 

 

 

 

 

Volts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.5

300

1000 ft.

 

600 ft.

 

375 ft.

 

250 ft.

 

 

 

 

 

 

 

 

 

5

600

500 ft.

 

300 ft.

 

200 ft.

 

125 ft.

 

 

 

 

 

 

 

 

 

7.5

900

350 ft.

 

200 ft.

 

125 ft.

 

100 ft.

 

 

 

 

 

 

 

 

 

10

1200

250 ft.

 

150 ft.

 

100 ft.

 

 

 

 

 

 

 

 

 

 

 

15

1800

150 ft.

 

100 ft.

 

65 ft.

 

 

 

 

 

 

 

 

 

 

 

20

2400

125 ft.

 

75 ft.

 

50 ft.

 

 

 

 

 

 

 

 

 

 

CAUTION: Equipment damage can result from low voltage.

 

 

 

 

 

 

 

 

 

 

 

 

GA-2.5H A.C. GENERATOR — OPERATION & PARTS MANUAL — REV. #5 (03/04/08) — PAGE 21

Page 21
Image 21
Multiquip GA-2.5H - PRE-INSPECTION, General Inspection Prior to Operation Ground Power Tools, Extension Cable, Death