19
DECORATIVE BRICK PANEL INSTALLATION
1.Carefully remove the glass door and all logs. (Refer to the installation manual)
2.Remove the two screws holding the front portion of the rear air deflector. Remove the pilot shield by removing the two screws as illustrated. (Fig. 42)
figure 42 |
STEP |
#2 |
PILOT SHIELD |
3.Remove the 3 screws holding the burner down and carefully remove the burner. (Fig. 43)
4.Install the right brick panel by sliding the bottom edge of the panel down the right firebox side then pivot the top edge of the panel into place against the firebox wall. Hold in place with the brick retainers. (Fig. 44)
STEP
#3
figure 43
5. | Rest the bottom edge of | the | rear | panel | on | top | |
of the rear portion of the | air | deflector | at the | back | of | ||
the | firebox and push into | place. | The | rear | panel | is | |
held | in place when both | side | panels are in | position. |
6.Install the left brick panel using the same method described in step 4.
7.Replace the burner, air deflector, logs and glass door.
123
figure 45
HERRINGBONE PATTERN ILLUSTRATEDNote: Due to the brittle material of the bricks, care must
be taken not to bend or force them into place.
Note: Refractory panels require a 24 hour curing period
on a low flame.
When shipped, the brick panels range in varying shades of tan. During initial use, the panels will emit a slight odor for a few hours. This is a normal condition that will not occur again. Simply open a window to sufficiently ventilate the room. The appearance of the panels will permanently
lighten in colour with use.figure 44