
Chapter 2 Configuration and Installation
SCXI-1121 User Manual 2-12 www.natinst.com
Using the Internal Half-Bridge CompletionYour SCXI-1121 includes half-bridge completion for half-bridge and 
quarter-bridge setups. The completion network consists of two 
4.5kΩ± 0.05% ratio tolerance resistors with a temperature coefficient of 
5 ppm/°C. These resistors are connected in series. To enable the network, 
you must set two jumpers for each input/excitation channel pair.
When the completion network is enabled, you cannot access the negative 
input of the amplifier, which preserves the overvoltage protection of the 
channel. Table 2-9 shows how to enable and disable the completion 
network.
Note When using the half-bridge completion network with a quarter-bridge setup, you 
must use an extra resistor to complete the bridge. Place this resistor on the terminal block 
between the positive input channel and the negative excitation output.
Table 2-9.  Completion Network Jumpers
Channel Jumpers Enable Completion Disable Network 
(Factory Setting)
0W1 and W2
1W17 and W18
A      B
W2
W1
1        2        3
•
•
•
•
•
•
•
A      B
W2
W1
1        2        3
•
•
•
•
•
•
•
A      B
W18
W17
1        2        3
•
•
•
•
•
•
•
A      B
W18
W17
1        2        3
•
•
•
•
•
•
•