New Buck Corporation 74 installation instructions Final Check

Models: 74

1 37
Download 37 pages 52.32 Kb
Page 20
Image 20
FINAL CHECK

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

4.Plug the power cord into a 115V AC outlet when using with optional motor. ”Do not run power cord under unit or in high traffic areas”.

5.Place crumpled pieces of newspaper in the stove. Light it and close the door. Ensure that the stove draws properly through the primary draft.

6.Check for smoke leaks around the door.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

18

Page 20
Image 20
New Buck Corporation 74 installation instructions Final Check