SECTION VII

SECTION VII

OPERATION

This section of the manual is to help you get the maximum efficiency and maximum smoke (particulate) reduction from your heater. If you should experience any difficulty or have any questions concerning your heater, contact your dealer for assistance. NOTE: The manufacturer recommends that for maximum performance burn seasoned natural hard wood.

Build a fire for maximum efficiency. This model burns wood and extracts heat so efficiently, a large fire is not necessary. A large fire not only wastes energy, it usually results in the home being too warm for comfort.

The following steps will serve as a guide for operating your stove.

BUILDING A FIRE

1.Open the door.

2.Open the primary air control under hearth, push in. To close pull all the way out.

3.Twist two pieces of non-colored newspaper into a roll and place them on the floor of the firebox.

4.This model is not designed for the use of grates, andirons or other methods of supporting the fuel.

5.Lay several pieces of dry kindling on top of the newspaper.

6.Place three or four small pieces of firewood, 2"-3" in diameter, on top of the kindling.

7.Light the newspaper in the front. Close and latch the door. Don't leave the fire unattended at

this point. The draft system of the heater should start quickly. It may be necessary to preheat the chimney to get the draft started. To do this, open the door and add newspaper to the top rear of the wood. Light or let this paper ignite and allow to burn while holding the door slightly cracked. Once the draft has started, close and lock the door. You are over- heating the unit if the chimney and or connector glows red.

8.NOTE: After embers and a coal bed have been established, load the heater with seasoned natural hard wood, placing it length way front to rear.

NOTE: THE FUELING DOOR MUST REMAIN CLOSED DURING OPERATION.

BURN RATE

LOW

MED-LOW

MED-HI

HI

AIR SETTINGS

5/16”

3/8”

5/8”

WIDE OPEN

NOTE: If the optional blower is being used on the Model 74, operate the blower in the “OFF” position for the first thirty (30) minutes after starting the fire and in the “OFF” position for thirty (30) minutes after refueling the fire. Set fan speed according to desired Heat output. Do not run power cord underneath heater, or in walk way or heavy traffic areas.