New Buck Corporation 74 installation instructions Final Check, Recheck the specified clearances

Models: 74

1 37
Download 37 pages 52.32 Kb
Page 31
Image 31
Manual background

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

4.Plug the power cord into a 115V AC outlet when using with optional motor. Do no run power cord under unit or in high traffic areas.

5.Place crumpled pieces of newspaper in the stove. Light it and close the door. Ensure that the stove draws properly through the primary draft.

6.Check for smoke leaks around the door.

7.Open the door and check for smoke escaping from the front of the stove. Smoking usually indicates a defective or poorly positioned chimney. Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong. Once the chimney heats up, a proper draft can usually be obtained.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

29

Page 31
Image 31
New Buck Corporation 74 installation instructions Final Check, Recheck the specified clearances